Splashboard for long, bulky parts and for workpieces that are placed in front of the extraction surface, e.g. with an overhead conveyor.
Combination with crane or overhead conveyor systems possible
Rear water curtain
Control cabinet
Energy saving circuit
Light (Ex- or not Ex-protected)
Pneumatic dosing pump for the coagulant
Automatic water level control